The time has now come to resurrect this Topic, now that
'257 Squadron' has left the Works for the Swanage Railway.
The Boiler for
'Eddystone' is currently at Buckfastleigh, where work is well under way on its restoration.
The Frames and Driving Wheels are at Tyseley, where they have been cleaned and the painted on:
- Those sections of the Frames that would be covered by the Wheels
- The back of the Wheels.
The Driving Wheels were reunited with the Frames on 28th September. Attention now moves to the Bogie and Pony Truck. The 'Rolling Chassis' will soon be delivered back to Herston Works, when we can then start re-building the Locomotive.
I attended the recent 'Volunteer Session' at Herston Works. We worked on the new Tender for
'Eddystone', inside the Works, preparing the sides for painting . We then moved outside, scraping the grease and oil, etc. off the 6'-2'' Driving Wheels for
'Sidmouth'. These are actually the re-tyred Wheels off of
'Sir Keith Park' because
'Sir Keith Park' is running on the re-tyred Wheels off of
'Sidmouth'. (This 'wheel swap' situation is quite normal).
Southern Locomotives Ltd have posted some photos on their website. As always, these photos have not been numbered, but are a continuation from my Post of 13th September (under the
'257 Squadron' Topic) and will therefore be:
- Pics
109 to
120 incl. Please use the link below:
https://photos.google.com/share/AF1QipN ... UwVm1Ja2V3(Make sure you read the (sometimes) humorous comments on each Pic !).
PW