Page 2 of 2

Re: Overhaul of Locomotive 34028 'Eddystone'

PostPosted: Wed Mar 18, 2020 3:45 pm
by 34053
Southern Locomotives Ltd have posted some more Photos (taken in Jan & Feb 2020 ) on their website. These continue to show the ongoing work with the Overhaul of 'Eddystone', at Herston Works, Swanage.

They also include some more of the continuing work being carried out on 'Manston', at Tyseley (Birmingham).

Please use the link below to see these Photos (My Pic Nos 1 to 21 incl.):

https://photos.google.com/share/AF1QipO ... NlOGx3MF9B

[Unfortunately, at the time of posting this, no titles have been added to the photos. Hopefully, these will be added, in due course, by SLL].


PW

Re: Overhaul of Locomotive 34028 'Eddystone'

PostPosted: Thu Apr 23, 2020 2:25 pm
by 34053
Southern Locomotives have posted some more photos on their website. These will be the last for some time as they were taken on 12th March, during the last Volunteer Session at Herston Works, prior to the Coronavirus 'Lock Down' from 24th March.

At that time, 'Eddystone' was only about 3 months away from completion!

Please use the link below to see these Photos (My Pic Nos 22 to 35 incl.):

https://photos.google.com/share/AF1QipO ... NlOGx3MF9B


[Most of the Photos in my previous Post have now had their titles added. You may, therefore, also wish to revisit these]

PW

Re: Overhaul of Locomotive 34028 'Eddystone'

PostPosted: Fri Nov 13, 2020 3:10 pm
by 34053
Here are some photos, from the Southern Locomotives Ltd website, taken in October and the first ones of 'Eddystone' since the Covid-19 'Lockdown' in March (see previous Post).

Please use the link below to see these Photos (My Pic Nos 36 to 41 incl.):

https://photos.google.com/share/AF1QipO ... NlOGx3MF9B

PW

Re: Overhaul of Locomotive 34028 'Eddystone'

PostPosted: Tue Mar 09, 2021 2:55 pm
by 34053
It's been a while, but Southern Locomotives Ltd have now posted some more photos on their website, showing the continuing work on 'Eddystone', 'Sidmouth' and 'Norman'.

Please use the link below to see these Photos (My Pic Nos 42 to 45 {December 2020} and 1 to 19 {January; February and March 2021}).

https://photos.google.com/share/AF1QipP ... x0YlpKVnlB

PW

Re: Overhaul of Locomotive 34028 'Eddystone'

PostPosted: Mon May 03, 2021 5:22 pm
by 34053
34028 'Eddystone' left Herston Works, by road (to go to Norden) on 26th April 2021, following her Major ('10 Year') Overhaul. Here she was reunited with her Tender. The Locomotive is now ready for Testing and Commissioning before entering Service on the Swanage Railway, after seven years of the Overhaul. She looks absolutely immaculate!

PW

Re: Overhaul of Locomotive 34028 'Eddystone'

PostPosted: Mon Sep 13, 2021 7:20 pm
by 34053
'West Country Class' Locomotive, 'Eddystone' had been performing well since 'returning to traffic'. However, a crack has been found in the Bogie Frame. We are indebted to the Mid-Hants Railway who have loaned us their Bogie Frame from 'Wadebridge' for a couple of months, which will enable 'Eddystone' to be operational within a few days.

PW

Re: Overhaul of Locomotive 34028 'Eddystone'

PostPosted: Sun Nov 28, 2021 3:48 pm
by 34053
Continuing on from my earlier Post of Tue Mar 09, 2021, Southern Locomotives have posted some more photos on their website. These show the continuing (and sometimes 'unplanned'!) work on each of the 'home based' Locomotives ('Eddystone'; '257 Squadron'; 'Sidmouth'; 'Manston' and '80104').

Please use the link below to see these Photos (My Pic Nos 20 & 21 {March 2021} and 22 to 76 {April through to October 2021}:

https://photos.google.com/share/AF1QipP ... x0YlpKVnlB

PW

Re: Overhaul of Locomotive 34028 'Eddystone'

PostPosted: Sat Jan 15, 2022 2:50 pm
by 34053
To conclude all the work on the various Locomotives that has taken place in 2021, Southern Locomotives Ltd have added some photos to their website. These cover the period from October to December 2021. Please use the link below to see these Photos (My Pic No's 77 to 116 incl.):

https://photos.google.com/share/AF1QipP ... x0YlpKVnlB

Now that 'Eddystone' has returned to service, my future Posts will come under the 34010 'Sidmouth' Topic (which will also include the ongoing work on 35025 'Brocklebank Line').

Some good news regarding 34070 'Manston'. This Locomotive has now, at last, returned to Herston Works (as shown in the above photos) after 4 years away at Tyseley (Birmingham) undergoing repairs (and Overhaul) following the 'low speed shunt' at Swanage. There is still about 3 months' work to be carried out, at Herston Works, before this Locomotive can return to service.

Wishing you all a Happy and Healthy 2022.

PW

Re: Overhaul of Locomotive 34028 'Eddystone'

PostPosted: Thu Oct 17, 2024 7:10 pm
by 34053
Things have moved on somewhat since my previous Post on 34028.

'Eddystone' has entered Herston Works for a (routine) Piston & Valve (P&V) Inspection. PLUS: Additional work to prepare the Locomotive for (possible) Main Line Running!

PW